Renewable-Energy-Industry.com

Business World of Renewable Energy

Fotolia 73444491 XL 1280 256

Press release

Nordex Group receives order for 99 MW project from Argentina


Hamburg, Buenos Aires (renewablepress) - The Nordex Group has received an order from AES Argentina Generación, a subsidiary of the energy provider AES Corporation, for the delivery of 30 AW132/3300 turbines.

The “Energética” wind farm is located in the Province of Buenos Aires near Bahia Blanca. The location is characterised by average wind speeds above 10 metres per second. The Nordex Group will be assembling the turbines locally in Argentina and will be manufacturing the 120-metre high concrete towers locally as well. The contract also comprises a multi-year service for the wind farm.


About the Nordex Group
The Group has installed wind power capacity of more than 23 GW in over 25 markets, generating sales of around EUR 3.1 billion in 2017. It currently has roughly 5,000 employees. The production network comprises plants in Germany, Spain, Brazil, the United States and India. The product range primarily concentrates on onshore turbines in the 1.5 - 4.8 MW class addressing the requirements of land constrained as well as grid constrained markets.


Download press photo:
https://www.iwrpressedienst.de/bild/nordex/dbabb_windfarmcows.jpg
© Nordex SE

Hamburg, Buenos Aires, 4 September 2018


Publication and Reprint free of charge; please send a voucher copy to Nordex SE.


Attention editorial offices: For further questions please contact

Media contact:
Felix Losada
Phone: +49-40-30030–1000
E-Mail: flosada@nordex-online.com

Investor contact:
Nordex SE
Felix Zander
Phone: +49 (0)40 / 300 30 – 1116
E-Mail: fzander@nordex-online.com


Nordex SE
Langenhorner Chaussee 600
22419 Hamburg

Internet: http://www.nordex-online.com




Press release from the Renewable Energy Industry delivered by Renewable Press
Please note: The emittent / publisher »DE813076467« is responsible for all contents.

 


Companies