Renewable-Energy-Industry.com

Business World of Renewable Energy

Nordex Turkey 14042016 1280 256

GE

Sao Paulo - Following the requirements put in place by the Brazilian Economical and Social Development Bank (BNDES) for wind turbine components to be locally manufactured, GE has announced the completion of the nationalization of its 3.15MW Double Fed Induction Generator (DFIG) which integrates with onshore wind turbines of 3 MW power range.

The achievement marks GE as the only supplier of generators of this power rating, compliant with Finame requirements, the special credit line for the purchase of components produced locally. The DFIG component is already being manufactured in GE Power Conversion



Source: IWR Online, 25 Nov 2015

 


Companies