Renewable-Energy-Industry.com

Business World of Renewable Energy

Fotolia 73444491 XL 1280 256

Press releases

wpd and Australis Energy agree joint venture for three offshore projects in Australia

01 Jul 2022 | Bremen/Germany and Collingwood/Australia (renewablepress) - wpd offshore Australia Holding GmbH (wpd), part of wpd group, and Australis Energy Ltd (Australis) have entered into a 50:50 joint venture for three offshore wind energy projects off the coast of Australia. The development of the three proj... read mroe...


ENERCON secures construction bridge financing for 134.4 MW wind farm in Sweden

30 Jun 2022 | Frankfurt am Main (renewablepress) - ENERCON reaches financial close under a EUR 118m senior facilities agreement with DNB Bank ASA (“DNB Bank”) who acted as the sole mandated lead arranger. The bridge financing is dedicated for the construction of wind farm Ersträsk North with a total capacity of 1... read mroe...


RENAC’s Popular Green Energy Summer School Starts Again In-person in August

28 Jun 2022 | Berlin (renewablepress) - This August, RENAC will welcome participants back to the RENAC Training Centre in Berlin, Germany for the popular Green Energy Summer School (GESS). It will run from 22 August to 2 September 2022. There are two courses in this programme: Introduction to Renewable Energy Tec... read mroe...


Nordex Group receives 63 MW order from OX2 in Poland

23 Jun 2022 | Hamburg (renewablepress) - The Swedish wind farm developer OX2 has placed an order with the Nordex Group for the supply of eleven N149/5.X turbines for the "Wysoka" wind farm in Poland. The order also includes a Premium Service for the turbines covering a period of 30 years. The 63 MW "Wysoka" wi... read mroe...


Nordex Group starts 2022 with sales of EUR 933 million

21 Jun 2022 | - Sales totaling EUR 933 million - Adjusted EBITDA margin before footprint reconfiguration costs at minus 5.6 percent - Solid order intake of 1.2 GW - Order book for projects and services at EUR 9.3 billion - Updated guidance for 2022 and mid-term strategic target of 8 percent EBITDA margin conf... read mroe...


WIND-consult is accredited for the determination of the site quality after commissioning according to Technical Guideline 10 (TR10)

20 Jun 2022 | Admannshagen-Bargeshagen (renewablepress) - The determination of the site quality after commissioning has to be carried out according to EEG by DIN EN ISO IEC 17025 accredited testing laboratories. Prerequisite for the accreditation is the successful participation in the round robin test for the det... read mroe...


Consistently high standards: ENERTRAG Powersystem is again certified according to ISO/IEC 27001 and DIN EN ISO 9001

17 Jun 2022 | Dauerthal (renewablepress) - In the bag: Recently, the products and services of ENERTRAG Powersystem have been recertified. This follows on from the initial certifications of 2017 and 2019. The ENERTRAG Powersystem is the platform for managing renewable energy plants. "With the recertifications,... read mroe...


Nordex Group receives orders for 369 MW from Colombia

16 Jun 2022 | Hamburg (renewablepress) - The Nordex Group wins orders in Colombia: Celsia Colombia S.A., an electricity producer and distributor, has ordered 63 N155 turbines with a total of 369 MW for three projects. The orders also include a Premium Service contract for maintenance of the turbines for a period ... read mroe...


Cooperation between Q-Energy and EEG Eifel: 10 Greenfield Projects Withe a potential of 316 Megawatts

15 Jun 2022 | Berlin (renewablepress) - Q-Energy, a global investment and management platform focused on renewable energy, energy transition and sustainability, today announced a collaboration with EEG Eifel, a wind farm developer with more than 20 years of experience based in Ferschweiler, Germany, to jointly de... read mroe...


Eneco and Deutsche Windtechnik sign 5-year agreement for major component exchanges at the OWP Prinses Amaliawindpark

15 Jun 2022 | Utrecht (NL)/Bremen (GER) - (renewablepress) - Wind farm owner Eneco has assigned Deutsche Windtechnik to perform major component exchanges in the Dutch offshore wind farm Prinses Amalia during a period of five years, starting in August. The wind farm is composed of 60 Vestas V80 wind turbines. The ... read mroe...