First Solar Shifts Malaysian Production Capacity to Series 5 Assembly
Tempe, USA - First Solar announced that it is reallocating production capacity at its Kulim, Malaysia, facility to support a new assembly line dedicated to the company's recently announced Series 5 thin film photovoltaic module offering.
According to Chief Operating Officer Tymen de Jong, the shift in production capacity is driven by First Solar's long-range business plan, which focuses on maximizing the company's core technology based on the thin film Cadmium Telluride (CdTe).
"Over the past two years, execution of our CdTe technology roadmap has positioned the product as the industry leader for utility-scale solar, as well as established a promising path into the future. The Series 5 module, and the Series 6 module still in concept development, are game-changing products that position us for exciting growth. They require the full attention of our manufacturing operations," said de Jong.
With this production transition, virtually all of the Kulim production associates previously assigned to the TetraSun line will move to the Series 5 assembly line, which will be in full operational mode by early 2017.
Source: IWR Online, 06 Jul 2016